Seri Saujana Bridge

<< >>

Architecture

Building developer: Road Builder (M) Holdings Berhard
Architect: PJS International
Location: Putrajaya, Malaysia
Country: Malaysia
Year of construction: 2003
Length: 300

Lighting

-5NA717
-5NA747
-5NX724

The Bridge is the main entrance to the Commercial Precint from the western residential area in Precint 7.

The concept of the cable stayed arch bridge is designed for Seri Saujana bridge. The design emphasizes on the aesthetics of the surrounding, the structural stability, low maintenance cost, and the riding quality on the bridge deck.

The Bridge is having a single span with total length of 300 meters and 32 meters width which provide two carriage ways, two pedestrian walkways, and two cycle lanes.


>> more Traffic references
>> all references